Notes/Observability/04 Distributed Tracing/09 Critical Path Analysis

9 — Fan-Out Metrics and Trace Shape

The Prometheus metrics that instrument a fan-out pattern (width, shard latency, aggregation, partial results, cancelled workers, hedged requests), the OTel trace waterfall shape that reveals the tail shard, and when requests fan out to multiple shards vs route to a single one.

Updated July 1, 2026·§202607010006·
Chapter Navigation
On This Page

9 — Fan-Out Metrics and Trace Shape

One thing that confuses many people is that these metrics are not automatically available. They are application-level business metrics that the developer (or platform team) instruments into the code.

Let’s use a realistic example.


Suppose a customer searches for:

“wireless headphones”

The Search API receives the request.

Instead of one database, the data is spread across 5 shards.

                Search API

        ┌──────┬─────┼──────┬──────┐
        │      │     │      │      │
     Shard1 Shard2 Shard3 Shard4 Shard5

The Search API sends 5 requests simultaneously.

This is a fan-out.


When will you see fan_out_width_total?

Suppose every request is split into 5 shards.

Request 1
 ├──Shard1
 ├──Shard2
 ├──Shard3
 ├──Shard4
 └──Shard5

Developer records

fan_out_width_total{service="search",operation="search"} 5

Meaning

Every search request fans out into 5 workers.

If tomorrow data grows and there are 20 shards,

fan_out_width_total = 20

This metric tells you how much parallel work every request creates.


When will you see fan_out_shard_latency_seconds?

Every shard responds at different speeds.

Shard1   25 ms
Shard2   31 ms
Shard3   19 ms
Shard4   420 ms   ← Slow
Shard5   28 ms

The application records

fan_out_shard_latency_seconds{shard_id="1"}
fan_out_shard_latency_seconds{shard_id="2"}
...

Over time, Prometheus builds histograms.

Grafana might show

P99

Shard1 30ms
Shard2 35ms
Shard3 22ms
Shard4 430ms   ← problem
Shard5 31ms

Immediately you know:

Shard 4 is the slow shard.


When will you see fan_out_aggregation_latency_seconds?

After all workers return,

the parent still has work to do.

For example:

Shard1 -> 100 products
Shard2 -> 90 products
Shard3 -> 120 products
Shard4 -> 80 products
Shard5 -> 110 products

Now the Search API must

  • combine results
  • remove duplicates
  • rank
  • sort
  • return top 20

That processing might take

18 ms

Developer records

fan_out_aggregation_latency_seconds = 18ms

If this suddenly becomes

220 ms

the bottleneck isn’t the shards—it’s the aggregation logic.


When will you see fan_out_partial_result_total?

Suppose

Shard1 ✓
Shard2 ✓
Shard3 ✗ Timeout
Shard4 ✓
Shard5 ✓

Instead of failing the request,

the service returns

Results from 4 shards

This is a partial result.

Developer records

fan_out_partial_result_total{
    reason="timeout"
}

Later Grafana may show

Timeout partial results

10 yesterday

150 today

Meaning

One or more shards are frequently failing.


When will you see fan_out_cancelled_worker_total?

Imagine the client waits only

200 ms

Timeline

Shard1 30ms
Shard2 45ms
Shard3 40ms
Shard4 500ms
Shard5 35ms

At

200ms

the client gives up.

The parent cancels everything.

Parent

   ├──Worker1 ✓
   ├──Worker2 ✓
   ├──Worker3 ✓
   ├──Worker4 CANCELLED
   └──Worker5 ✓

Developer increments

fan_out_cancelled_worker_total++

If this metric keeps increasing,

either

  • deadlines are too aggressive, or
  • some shard is consistently slow.

That’s why the alert says:

fan_out_cancelled_worker_total rising

Then you check

fan_out_shard_latency_seconds

and usually find

Shard4 P99 = 480ms

When will you see fan_out_hedged_requests_used_total?

Suppose

Normally

Shard4 = 25ms

Sometimes

Shard4 = 800ms

After waiting 50 ms,

the system sends another request to a replica.

Original -----> Replica A

                 50ms later

Duplicate -----> Replica B

Replica B finishes first.

The application uses Replica B’s answer and cancels Replica A.

Developer records

fan_out_hedged_requests_used_total++

This metric tells you

How often slow replicas forced us to send backup requests.

A sudden increase may indicate growing tail latency in the storage or service layer.


When would you see these metrics in Grafana?

Imagine a dashboard during an incident:

MetricValueInterpretation
fan_out_width_total5Each request queries 5 shards
fan_out_cancelled_worker_total2/min → 500/minMany workers are being cancelled
fan_out_partial_result_total0 → 120/minUsers are receiving incomplete results
fan_out_shard_latency P99 (Shard4)30 ms → 650 msShard 4 is the bottleneck
fan_out_aggregation_latency15 msAggregation is healthy
fan_out_hedged_requests_used_total3/min → 250/minBackup requests are being used frequently

From this dashboard alone, you could conclude:

  • The aggregator is functioning normally.
  • Shard 4 is experiencing high latency.
  • Parent requests are timing out and cancelling slow workers.
  • Partial results are increasing because of those timeouts.
  • Hedged requests are masking some of the latency but at the cost of extra load.

The trace shape

If the service is instrumented with OpenTelemetry, a trace for one request would look like this:

Parent Request Span (Search API)

├── Worker Span (Shard 1)  25 ms
├── Worker Span (Shard 2)  31 ms
├── Worker Span (Shard 3)  19 ms
├── Worker Span (Shard 4) 420 ms  ← longest child span
├── Worker Span (Shard 5)  28 ms
└── Aggregation Span        18 ms

In a trace waterfall, the longest child span immediately identifies the tail shard that is delaying the overall request. This is exactly the trace pattern interviewers often expect you to describe when discussing fan-out architectures.

Is this realistic?

Yes. This is realistic, but the key concept you’re missing is why data is sharded in the first place.

A request does not fan out because someone arbitrarily decided to send it to 20 places. It fans out because the required data is physically distributed across multiple machines.

Let’s build the intuition.


Start with one database

Suppose you’re building a small e-commerce site.

All products live in one database.

                Search API


              Products Database

A search request

“wireless headphones”

goes to one database.

No fan-out.


The database becomes too large

Now your company has:

  • 500 million products
  • millions of users
  • tens of thousands of searches per second

One database server can no longer:

  • store everything
  • answer queries fast enough
  • handle all the traffic

So you partition (shard) the data.


Now there are 5 shards

Instead of one huge database:

          Products

        ┌──────────┐
        │ Shard 1  │
        ├──────────┤
        │ Shard 2  │
        ├──────────┤
        │ Shard 3  │
        ├──────────┤
        │ Shard 4  │
        └──────────┘
        │ Shard 5  │

Each shard stores different products.

Example

Shard1
A-D

Shard2
E-H

Shard3
I-L

Shard4
M-R

Shard5
S-Z

Now what happens?

User searches

“wireless headphones”

Which shard has it?

Could be:

  • Shard1
  • Shard2
  • Shard3
  • Shard4
  • Shard5

The Search API doesn’t know.

So it asks every shard simultaneously.

Search API

 ├──Shard1
 ├──Shard2
 ├──Shard3
 ├──Shard4
 └──Shard5

This is fan-out.


Is this actually how companies do it?

Sometimes.

But there are different sharding strategies.


Strategy 1 — Broadcast search (fan-out)

Search engines often broadcast the query.

Search

     "headphones"




Shard1
Shard2
Shard3
Shard4
Shard5

Each shard returns its best matches.

The Search API merges them.

This is exactly what:

  • Elasticsearch
  • OpenSearch
  • Solr

do internally.

If you have 50 shards, the coordinator node really may send the search to all 50 relevant shards.


Strategy 2 — Route to one shard

Suppose you’re fetching

Customer ID = 12345

The system computes:

12345 % 5 = 0

Therefore

Shard 0

Only one shard is queried.

No fan-out.

Many user profile, banking, and order services use this approach.


Strategy 3 — Partial fan-out

Suppose data is partitioned by region.

Shard1  US-East

Shard2  US-West

Shard3  Europe

Shard4  India

Shard5  Japan

If the user searches

Hotels in Pune

Only the India shard is queried.

No need to contact the others.


So when do we really fan out to 20 shards?

Very commonly in search systems.

For example:

Amazon Search

Search Coordinator



 ├──Shard1
 ├──Shard2
 ├──Shard3
 ...
 ├──Shard20

Each shard indexes a subset of products.

Each shard returns:

Top 100 matches

The coordinator merges them into

Top 100 overall

This is called scatter-gather, a classic distributed search pattern.


Think about Grafana Loki or Elasticsearch.

You search:

error AND payment
last 24 hours

Logs may be split across many storage nodes or time partitions.

The query fans out:

Query Frontend



 ├──Store1
 ├──Store2
 ├──Store3
 ├──Store4
 └──Store5

Each store searches its local data.

Results are merged.

This is exactly how large-scale log systems achieve performance.


Since you’re an Observability Architect

You’ll encounter this pattern frequently in systems such as:

  • Grafana Mimir: A query frontend fans out PromQL queries to multiple queriers, which in turn fetch data from distributed storage.
  • Grafana Loki: Query frontends split and distribute log queries across ingesters and store-gateways.
  • Elasticsearch/OpenSearch: A coordinating node sends search requests to all relevant index shards and merges the results.
  • Apache Cassandra: Reads may contact multiple replicas depending on the requested consistency level.
  • Bigtable, HBase, ScyllaDB: Range scans can span multiple tablets or partitions.

The important distinction

You’re mixing two different ideas:

  • Data partitioning (sharding): Data is split across machines so the system can scale.
  • Fan-out: A single request is sent to multiple machines because the data needed for that request spans multiple partitions.

Not every sharded system fans out every request. Point lookups often go to a single shard, while search, analytics, dashboards, and distributed queries commonly fan out to many shards. Understanding when a request can be routed directly versus when it must gather results from multiple partitions is a fundamental system design concept.

Metadata

DimensionDetail
AuthorAmit Singh
Scopeobservability

Local graph

Full graph →

Linked from 8 notes

Q3 Answer — Context Cancellation Leak

Worked answer to Fan-Out/Fan-In Practice Q3: diagnosing a ghost-request leak where client-visible errors look healthy but infra cost and downstream CPU are elevated.

2 — The Signals

Metrics, logs, traces, profiles, and events — what each is built to capture, what it costs, and which question it actually answers vs. which one people mistakenly ask it.

7 — Distributed Tracing Backend

How spans that arrive out of order, from different services, get assembled into one trace — and the two competing storage models (indexed search vs. object storage plus a trace-ID lookup) that trade query flexibility for cost.

1 — OpenTelemetry SDKs & Semantic Conventions

OpenTelemetry is a specification and an API/SDK, not a backend — the pieces that make it up, and the semantic-convention vocabulary that lets two unrelated teams' telemetry be queried the same way.

2 — Tail Latency

Why the p99/p999 request latency matters more than the average in distributed systems — a single slow dependency in a fan-out can dominate the response time even when most calls are fast.

Observability Engineering

A book-shaped table of contents for observability engineering: foundations through architecture, metrics, logging, tracing, profiling, OpenTelemetry, instrumentation, Kubernetes/cloud, data platforms, visualization, alerting, SRE integration, cost, security, platform engineering, AI-driven operations, and MAANG interview preparation — cross-linking existing prometheus/grafana-cloud/kubernetes/sre/platform-engineering notes instead of duplicating them.

04 — Fan-Out / Fan-In

Decompose a request into parallel sub-tasks (fan-out), execute concurrently, then merge results (fan-in). The foundational pattern for latency-bound aggregation.

Patterns

A book-shaped table of contents for reusable engineering patterns spanning object-oriented design, enterprise architecture, distributed systems, messaging, APIs, cloud infrastructure, observability, security, concurrency, AI/agentic systems, and organizational design — grounded in production experience at scale.